Wool Group

Wool Group – General Activity List

Take a look at the action in this movie clip

Start Finish Activity
4/05/2010 Gudair Vaccination of Wool Challenge Sheep; FEC testing (21 days post quarantine drench)
4/05/2010 4/05/2010 WEC monitor test (21 days post quarantine drench)
19/05/2010 24/05/2010 WEC monitor test (35 days post quarantine drench)
Early June Inspection of Wool Challenge Sheep to ensure lice free status. Plung Dip if any lice present.
3/09/2010 Crutch and Click wool challenge sheep.
11/02/2011 Pre shearing crutch
22/03/2011 23/03/2011 Sampling and scoring Wool challenge
14/04/2011 15/04/2011 Shearing Wool challenge sheep.
3/09/2010 Crutch and Click wool merino challenge sheep.
11/02/2011 Pre shearing crutch
22/03/2011 23/03/2011 Sampling and scoring Wool challenge
14/04/2011 15/04/2011 Shearing Wool challenge sheep.
September 2011 Crutch and Click wool merino challenge sheep.
September 2011 Display wethers at Field Day
January 2012 January 2012 Pre shearing crutch
March 2012 Sampling and scoring Wool challenge
April 2012 Final Shearing Wool challenge sheep.

 

Comments are closed.